The construction of the new Waterfront Station in Southwest DC is continuing. The developer recently secured $250 million for construction financing
The first two new buildings are now above grade and noticeable as one passes by. The new Waterfront Station will reconnect 4th Street SW which was closed when the Waterside Mall was built decades ago. The path of the new 4th Street SW is visible in the photo below. 4th Street will curve around the existing Metrorail station.
More information about the new Waterfront Station is available on the developer's website: http://www.waterfrontdc.com/project/
ActiveRain Corp. is not responsible for the accuracy of the site's content (which is written by members of the ActiveRain Real Estate Network) and does not endorse the views of the real estate agents, mortgage brokers, and others listed here.
Powered by the ActiveRain Real Estate Network
© 2012 ActiveRain Corp. All Rights Reserved