The homeowners have moved in. On moving day the kitchen counters had yet to be installed. The wals have all beeen painted but the trim is still being installed and painted. The master en-suite hasn't been finished as they are waiting for glass for the shower and until that is installed, the sinks and toilet can't go in.
The counters are now in. The kitchen is almost done except for the backsplash. It really looks good. The windows have been installed. The fireplace is now finished. They added more shelve on either side and
covered the old stone with new and continued it almost to the ceiling.
The floors are dark maple throughout the house. It is looking great.
ActiveRain Corp. is not responsible for the accuracy of the site's content (which is written by members of the ActiveRain Real Estate Network) and does not endorse the views of the real estate agents, mortgage brokers, and others listed here.
Powered by the ActiveRain Real Estate Network
© 2012 ActiveRain Corp. All Rights Reserved